Edit
Attachments
  
  
  
  
  
  
FirmsContacted
  
ShortListedFirms
ShortListedFirmsRankings
  
 Attachment10/29/2012
  
Lake Run CreekEngineeringBridge Rehabilitation/Replacement
140
33
 
Wills, Burke Kelsey Associates
 Attachment10/29/2012
  
Fitchie CreekEngineeringBridge Replacement
140
33
 
Wills Burke Kelsey Associates
 Attachment10/26/2012
  
Il. Rt 25 to Hill AvenuePhase IPhase One Study
134
42
HDR
Civil Tech
HRGreen
220.0
215.5
213.5
HDR
 Attachment10/24/2012
  
VariousEngineeringStructure Inspections
140
15
Hampton, Lenzini and Renwick, Inc.
Collins Engineers, Inc.
Michael Baker, Jr. Inc
189.0
189.5
177.0
 
Collins Engineers, Inc.
 Attachment10/24/2012
  
LaFox Road at UPRR track and Brundige Road at UPRR TracksEngineeringDesign, agency coordination, construction oversight
140
6
Hanson
Robert E. Hamilton
CTC
195.5
178.0
178.0
Hanson Professional Service, Inc.
 Attachment10/24/2012
  
Cherry Lane to Illinois Route 38EngineeringStructure Rehabilitation
140
38
Alfred Benesch & Company
Crawford, Murphy & Tilly, Inc.
Strand Associates
 
Strand Associates -- 218.5
Alfred Benesch and Company -- 215.5
Crawford, Murphy & Tilly, Inc. -- 202.5
 
Strand Associates
 Attachment9/4/2012
  
N/A (Countywide)Traffic Engineering/OperationsAdministration assistance for the management of the County’s traffic operations infrastructure.
140
1
Hampton, Lenzini & Renwick, Inc. (HLR)
Hampton, Lenzini & Renwick, Inc. (HLR)
 Attachment8/31/2012
  
VariousPhase IIPreparation of all necessary engineering and PS&E documents for the deployment of various roadway safety countermeasures at various Kane County highway locations.
140
21
Christopher B. Burke Engineering, Ltd. (CBBEL)
Hanson Professional Services, Inc.
Terra Engineering, Ltd.
Christopher B. Burke Engineering, Ltd. (CBBEL) - 187.5
Hanson Professional Services, Inc. - 182.5
Terra Engineering, Ltd. - 182.5
Christopher B. Burke Engineering, Ltd. (CBBEL)
 Attachment5/29/2012
  
at Nelson Lake RoadPhase IIIntersection Improvement
140
34
Lochner SE3 V3
Lochner......201.5 SE3........207.5 V3.........192
SE3
 Attachment3/24/2012
  
NAImplementationYear 2012 Geographic Information System Support Services
140
8

 

GIS Solutions, Inc.................209
Great Arc Technologies Inc..206
TY Lin International..............176
GIS Solutions, Inc.
 Attachment3/8/2012
  
Keslinger Road to IL Rte 38 in Elburn IllinoisPhase IIIReconstruction and new construction of Anderson Road with bridge at UPRR
140
26
STV
Bollinger, Lach and Assoc
HR Green
STV-193
Bollinger,Lach and Assoc-198
HR Green-202
HR Green
 Attachment2/28/2012
  
Gary Ln, Delnor Dr and Randall Rd UPRR BridgePhase IIIConstruction of HMA bike path w/ 12 foot PCC tunnel & misc items
140
27
Civiltech,
STV,
Wight
Wight-177,
STV-186
Civiltech-194
Civiltech
 Attachment2/27/2012
  
KDOT CampusPhase IIIConstruction Observation services for the construction of an approximate 4,800 Sq Ft (including basement) building addition for an Arterial Operations Center, additional office and storage space.
140
6
ESI Consultants, Ltd.
Knight E/A, Inc.
Larson & Darby Group
Knight E/A, Inc. - 173
Larson & Darby - 164
ESI Consultants, Ltd. - 149
Knight E/A, Inc.
 Attachment2/27/2012
  
NASoftware/System EngineeringDevelopment and integration of Advanced Traffic Management System (ATMS) software and integration to the existing Kane County ATMS/ITS communications network and future Arterial Operations Center (AOC).
140
2
Delcan Corporation
TransCore ITS, LLC
TransCore ITS, LLC - 181.0
Delcan Corporation - 160.5
TransCore ITS, LLC
 Attachment2/16/2012
  
VariousPhase IIBridge Rehabilitation
140
38
WBK
exp
Baxter & Woodman
Fehr-Graham
WBK......188 exp.........176.5 Baxter & Woodman......174.5 Fehr Graham.......178
WBK, Fehr Graham, exp
 Attachment2/3/2012
  
CountywidePhase IIIMaterial Testing and project support as directed
140
9
AECOM, Rubino Engineering Inc, STATE Testing
AECOM---------166
Rubino Engineering--213
STATE Testing-------209
Rubino Engineering Inc
 Attachment1/3/2012
  
on Allen Road between Walker and Harmony RoadsPhase IIIStabilization of existing stream banks for Hampshire Creek
140
12
Christopher B. Burke Engineering LTD, Cotter Consulting Inc, ERA
CBBEL--------168
Cotter----------------161
ERA-------------------145
Christopher B. Burke Engineering LTD (CBBEL)
 Attachment12/2/2011
  
Varioius locationsPhase IIPreparation of all necessary engineering and PS&E documents for the deployment of various roadway safety countermeasures at various Kane County highway locations.
140
12
ESI Consultants, Ltd.
Regina Webster & Associates, Inc.
HDR
ESI Consultants, Ltd. - 179.0
Regina Webster & Associates, Inc. - 171.0
HDR - 164.5
ESI Consultant, Ltd.
 Attachment12/2/2011
  
Stearns Road - Randall Road to the Kane/DuPage County linePhase IIPreparation of all necessary engineering and PS&E documents for the deployment of various ITS technologies.
140
6
Gewalt Hamilton & Associates, Inc.
JACOBS Engineering Group, Inc.
HDR
JACOBS Engineering Group, Inc. - 184.0
Gewalt Hamilton & Associates, Inc. - 172.5
HDR - 170.5
JACOBS Engineering Group, Inc.
 Attachment11/30/2011
  
at Kaneville RdPhase I/IIIntersection Improvement
140
36
BLA
Burns & McDonnell
HDR
BLA - 194
Burns & McDonnell - 211.5
HDR - 209.5
Burns & McDonnell
 Attachment11/22/2011
  
Closest roads are Bahr and Berner and Berner and IL US 20Phase IIIPavement Widening & Resurfacing, left and right turns lanes,etc
140
25
Bollinger Lach & Assoc.
Clark Dietz
HR Green
BLA-------203
Clark Dietz------197
HR Green--------185
Bollinger Lach and Assoc(BLA)
 Attachment11/21/2011
  
Kane CountySurvey ServicesSurvey assistance as needed.
140
30
Trotter & Associates
Hampton, Lenzini, Renwick
Compass Surveying, LTD
179.5
176.5
160.5
Trotter and Associates
 Attachment10/21/2011
  
IntersectionPhase IIntersection Improvement
140
47
Thomas Eng
URS
RS & H
219
209
195
Thomas Engineering
 Attachment9/13/2011
  
Butterfield Road to Stearns RoadPhase IIIModernization of 21 intersections for integration with ATMS facilities
140
18
Ciorba
Thomas Engineering Group
STV
Ciorba Group Inc----179
STV-------------------145
Thomas Engr Group-137
Ciorba Group  Inc.
 Attachment9/13/2011
  
Randall and Foothill RoadsPhase IIIIntersection widening, lane add, storage increase and resurfacing
140
29
Homer Chastain and Assoc, LLP
Clark Dietz
TERRA Engr LTD
Homer Chastain and Assoc, LLP- 190
Clark Dietz--------------------------187
TERRA Engr LTD--------------------171
Homer Chastain and Assoc, LLP
 Attachment9/6/2011
  
N/AStudiesPerformance of various traffic engineering studies and tasks on an "as needed" basis.
140
16
TY Lin International
Hanson Professional Services, Inc.
Traffic Analysis & Design, Inc.
Hanson Professional Services, Inc. - 179.5
Traffic Analysis & Design, Inc. - 178.5
TY Lin International - 174.0
 
 
Hanson Professional Services, Inc.
 Attachment8/29/2011
  
Blackberry CreekPhase IIStructure Replacement
140
39
Henry O. Hefter-Associates, Inc.
Wills Burke Kelsey Associates, Ltd.
Teng & Associates, Inc.
Wills Burke Kelsey Associates, Ltd. - 218
Teng & Associates - 206.5
Henry O. Hefter-Associates, Inc - 189.5
Wills Burke Kelsey Associates, Ltd.
 Attachment7/5/2011
  
at IL 47Phase IIIntersection improvement
140
44
Strand
CMT
Burns & McDonnell
Burns & McDonnell - 211.5
Strand - 210.5
CMT - 209.5
Burns & McDonnell
 Attachment6/24/2011
  
IntersectionPhase IIntersection Safety Improvements 
140
45
Patrick Engineering
Crawford, Murphy & Tilly
H. W. Lochner, Inc.
221
219
189
Patrick Engineering
 Attachment6/13/2011
  
At intersection of McLean Blvd and Stearns RoadPhase IIIClearing and grading to create a new walking trail and nature area
140
16
AECOM
MACTEC
Thomas Engineering Group
AECOM- 161
EMAC fka MACTEC-174
Thomas Engineering Group- 118
EMAC fka MACTEC
 Attachment4/25/2011
  
Hampshire CreekPhase I/Phase IIBridge Replacement
140
44
Wills Burke Kelsey Associates, Inc.
Reynolds, Smith and Hills, Inc.
Teng & Associates, Inc.
Wills Burke Kelsey Associates, Inc. - 212
Teng & Associates, Inc. - 206
Reynolds, Smith and Hills, Inc. - 203
Wills Burke Kelsey Associates, Inc.
 Attachment4/25/2011
  
As notedPhase I/Phase IISee attached
140
42
WBK
Lonco
Baxter and Woodman
STV
WBK – 213.5 points
Baxter and Woodman – 198.5 points
STV - 198 points
Lonco – 195 points
WBK and Baxter &Woodman
 Attachment4/25/2011
  
I88Phase IISee attachment
140
31
Strand Associates, Inc.
STV, Inc.
Baxter and Woodman, Inc.
STV - 201.5
Strand Associates, Inc. - 198
Baxter and Woodman, Inc. - 188
STV
 Attachment4/21/2011
  
Development, Implementation and Technical AssistanceImpact Fee Ordinance UpdateImpact Fee Ordinance Update
136
6
CH2M Hill...............211
Wilbur Smith..........187.5
 
CH2M Hill
 Attachment3/14/2011
  
IntersectionPhase IIIntersection Safety Improvements
138
53
Bloom,
Pavia Marting
Gewalt Hamilton
Gewalt Hamilton 211
Bloom 204.3
Paving Marting 189.5
Gewalt Hamilton
 Attachment3/14/2011
  
IntersectionPhase IIIntersection Improvements
138
55
Bloom
CMT
Baxter and Woodman
CMT 205
Baxter and Woodman 200
Bloom 195.5
CMT
 Attachment3/1/2011
  
N/A (Countywide)Traffic EngineeringAdministration assistance for the management of the County’s traffic operations infrastructure, including approx. 140 traffic signal/flashing beacon locations, 900 street lights & approx. 45 mile of fiber optic ATMS network
136
3

1) Delcan Corporation

2) Hampton, Lenzini & Renwick, Inc.

3) Sam Schwartz Engineering, PLLC

1) Hampton, Lenzini & Renwick, Inc. (HLR) - 200.0
2) Delcan Corporation - 186.5
3) Sam Schwartz Engineering, PLLC - 162.5
Hampton, Lenzini & Renwick, Inc. (HLR)
 Attachment3/1/2011
  
CountywideTraffic EngineeringThe collection of various traffic data, including vehicle volume, speed, classification, etc. for various county highways for the years 2011 & 2012 and preparation of required deliverables.
136
6
1) Gewalt Hamilton & Associate, Inc.
2) Regina Webster & Associates, Inc.
3) Terra Engineering LTD.
1) Gewalt Hamilton & Associate, Inc. - 192.0
2) Terra Engineering LTD. - 191.5
3) Regina Webster & Associates, Inc. - 186.5
Gewalt Hamilton & Associate, Inc.
 Attachment2/10/2011
  
Umdenstock Road from Stearns Road to 597' north of Stearns RoadPhase IIIRemoval of existing bridge structure and approaches.  Construct a new bridge and approaches in a new location.
136
35
Crawford, Murphy & Tilly, Inc.
Environmental Design International, Inc.
Omega
Crawford, Murphy & Tilly, Inc___________180
Environmental Design International, Inc__173
Omega_____________________________186
Omega
 Attachment1/14/2011
  
US 30 to Jericho RoadPhase IIIWiden and reconstruction with storm water and traffic signal improvements
136
38
Bollinger Lach and Assoc, Inc
Civiltech Engineering, Inc.
Ciorba Group
Bollinger Lach------------------------139.5
Civiltech Engineering, Inc----------140.0
Ciorba Group------------------------127.5
Civiltech Engineering, Inc
 Attachment12/23/2010
  
Stevens Road to Burr RoadPhase IIIRemove concrete slab bridge and construct precast three sided structure.
136
27
BLA
ESI
STV
BLA___197
ESI___185
STV___169
BLA
 Attachment12/8/2010
  
Randall Rd at Fabyan ParkwayPhase IIIRoadway reconstruction, widen and add lane with storm sewer and traffic signal moderization
136
39
Ciorba Group Entran TranSystems
Ciorba Group-----------------------------152.0 Entan--------------------------------------149.5 TranSystems-----------------------------167.0
TranSystems
 Attachment12/7/2010
  
Randall Rd at I-88 overpassPhase IIIRemove and replace deck, abutments, approach slab and other features per plan
136
36
V3
Cotter Consulting
Homer Chastain and Assoc, LLP
V3-------------------------------------182.0
Cotter Consulting--------------------169.0
Homer Chastain and Assoc, LLP--- 176.0
V3
 Attachment12/1/2010
  
Damisch Road to McCormick RoadPhase IIIRemove two structures, build one, and relocate creek
136
37
2IM Group
Cotter Consulting, Inc.
TranSystems
2IM Group____________175
Cotter Consulting, Inc___204
TranSystems__________167
Cotter Consulting, Inc.
 Attachment11/10/2010
  
Sullivan Road northerly to Illinois Route 38, and along Illinois Route 38 westerly to the Kane County Judicial CenterPhase IIDevelop Phase 2 plans for Bus access along Randall road
135
28
V3 Companies,
Kimley-Horn,
Burns McDonnell
173.5
172
167
V3 Companies
 Attachment10/14/2010
  
County widePhase IIIRemove and replace wearing surface and other features to 6 bridges
136
32
Thomas Engineering Group, TranSystem, Stanley Consultants Inc
Thomas---------------------------178
Transystem-----------------------154
Stanley Consultants Inc----------171
Thomas Engineering Group
 Attachment8/24/2010
  
at Douglas RoadPhase IIIntersection Improvement
136
52
H. W. Lochner James J. Benes and Associates Knight Engineers & Architects
Lochner 208.5
JJB 208
Knight 200
Lochner
 Attachment8/5/2010
  
Dunham Rd to Randall RdPhase IIIConstruction observation of planting, seeding and various site improvements
136
17
Omega and Assoc
Engineering Services Group Inc
Hey and Assoc Inc
Hey and Assoc-------------163
Omega----------------------160
Engr Serv Group Inc--------90
Hey and Associates
 Attachment7/27/2010
  
Square Barn to Sleepy Hollow and Binnie to Countyline RdPhase IIIExpansion of County Traffic Signal Innerconnection System
136
25
MACTEC, DLZ Illinois, Gewalt Hamilton
MACTEC---------------------------------------------155 Gewalt-----------------------------------------------147 DLZ--------------------------------------------------131
MACTEC
 Attachment6/24/2010
  
Lake Marian RiverPhase IICulvert Rehabilitation/Replacement
136
38
Hampton, Lenzini and Renwick
 Attachment6/23/2010
  
VariousPhase IIFinal Design and Permitting
136
38
Homer Chastain, SEC, Strand Associates
Homer Chastain - 207.5
SEC - 203.5
Strand - 203
Homer Chastain
 Attachment5/27/2010
  
Building "A"StudiesInvestigate moisture collection and water leakage issues and to provide an effective solution.
140 and also advertised in the Chicago Tribune paper.
11
Epstein
Kluber, Inc.
PSI, Inc.
Epstein 154.5
Kluber, Inc. 141
PSI, Inc. 107.5
Epstein
 Attachment5/3/2010
  
Not ApplicableSoftware DesignGeneral technical support to GIS staff and enhancement and data integration of internal data viewer based on ESRI's flex api and GIS Server.
140
8
GIS Solutions Inc. - 
Great Arc Technologies, Inc. -
Patrick Engineering, Inc. -
182
168
169
GIS Solutions Inc.
 Attachment4/30/2010
  
IntersectionPhase IIIntersection and Realignment Plank at Burlington
140
65
Crawford, Murphy, Tilly, Inc.
H.W. Lochner, Inc.
Thomas Engineering Group, LLC
218
213.5
200.5
Crawford, Murphy, Tilly, Inc.
 Attachment2/11/2010
  
variousPhase IIBridge Maintenance
140
37
V3 Companies
Crawford, Murphy, Tilly, Inc.
Engineering Resource Associates, Inc.
187.5
187
159
V3 Companies
 Attachment2/8/2010
  
nonePhase IIIOn Call Material Testing for various County Construction Projects
140
7

Midland Standard Engineering and Testing, Inc
STATE Testing, LLC
Tecma Testing, Inc

Midland Standard Engineering and Testing..164
STATE Testing..........................................160
Tecma Testing..........................................141
Midland Standard Engineering and Testing, Inc
 Attachment1/5/2010
  
1/4 mile west of Big Timber and 2.5 miles north of Highland AvePhase IIISee SOI for project scope and description
140
38

ESI Consultants, Ltd
Burns and McDonnell
Trotter and Assoc, Inc.

 

172
161
149
ESI Consultants, Ltd
 Attachment12/22/2009
  
VariousEngineeringStructure Inspections
128
34
SEC Group
Crawford Murphy Tilly
Hampton Lenzini Renwick
204
215
222
Hampton Lenzini Renwick
 Attachment11/17/2009
  
Stearns Rd to IL 56/Butterfield RdPhase IIInterconnect & ITS Modernization
144
20
Jacobs
Gewalt Hamilton
AECOM
186.5
177
173.5
Jacobs
 Attachment11/17/2009
  
IL 25 to Nagle BlvdPhase I/IIAdding continuous left turn lane
144
48
EEI
Thomas
Kudrna

214.5
207.5
196.5
EEI
 Attachment11/3/2009
  
County-wideImplementationSurvey Assistance as needed
140
35
Hampton, Lenzini, and Renwick, Inc.
Engineering Enterprises, Inc.
Trotter and Associates, Inc.
180.5
180
169
Hampton, Lenzini, and Renwick, Inc.
 Attachment10/21/2009
  
County-WideEngineeringProfessional services from a qualified firm to provide for automated data collection, analysis, and software system for Pavement Management
144
10
Applied Research Associates (ARA)
Infrastructure Management Services (IMS)
Transmap
218
206.5
156
Applied Research Associates (ARA)
 Attachment10/8/2009
  
at Foothill/US 20 RampsPhase IIIntersection Improvements
140
48
HDR
Kudrna
Mactec

201.5
200
195.5
HDR
 Attachment9/3/2009
  
n/aOn-Appraisal ServicesOn-Call Appraisals
140
13
Civiltech
Hopkins
ESI
176
164
151.5
Civiltech & Hopkins
 Attachment9/3/2009
  
n/aReview Appraisal ServicesOn-Call Review Appraisal Services
140
10
Polach
Tibble
Steffens
172
159
0
Polach & Tibble
 Attachment8/13/2009
  
N/AOn-Call Traffic EngineeringOn-call engineering for various traffic related engineering tasks.
140
18
TY Lin International, Inc.
Hanson Professional Services, Inc.
CEMCON, LTD
Gewalt Hamilton Associates, Inc.
178
177
173.5
160
TY Lin International, Inc.
 Attachment6/16/2009
  
0.9 miles west of IL Rte 47 and 1000 ft eastPhase IIISee attached description on SOI
140
28
Collins Engineers, Inc.
ESI Consultants,LTD
Knight Engineers and Architects
156
130
110
Collins Engineers, Inc.
 Attachment5/12/2009
  
CountywideTraffic Signal EngineeringProviding assistance to our Traffic Engineering staff with the management and operations the County’s Traffic Signal/ITS/Street Lighting Systems.
140
4
Hampton, Lenzini & Renwick, Inc. (HLR)
Delcan Corporation
Christopher B. Burke Engineering, Ltd. (CBBEL)
Gewalt Hamilton Associates, Inc. (GHA)
189
166.5
163.5
153.5
 
Hampton, Lenzini & Renwick, Inc. (HLR)
 Attachment4/16/2009
  
County-WidePlanningTransit Component of the Kane County Long Range Comprehensive Plan
140
4
AECOM
Nelson/Nygaard
Vlecides/Schroeder Consulting Associates, Inc
175
214
199
Nelson/Nygaard
 Attachment3/25/2009
  
Between Randall Rd and Corron RdPhase IIIConstruction Observation
140
32
SEC Group, Inc.
Thomas Engineering Group
Infrastructure Engineering, Inc.
ESI consultants, Ltd.
159.3
141.5
137
126
 
SEC Group, Inc.
 Attachment2/24/2009
  
Orchard Rd to Main StPhase IIIConstruction Observation
140
8
Hampton, Lenzini and Renwich, Inc.
GRAEF-USA
Ciorba Group, Inc
158
137
123
Hampton, Lenzini and Renwich, Inc.
 Attachment2/24/2009
  
Bliss and Merrill RoadsPhase IIIConstruction Observation
140
33
GRAEF_USA
DLZ
RM Chin and Assoc, Inc
161
130
123
Graef
 Attachment2/13/2009
  
Randall Rd & Huntley Rd IntersectionPhase IIIntersection Improvements
140
50
V3 Companies, Ltd. 
Baxter & Woodman, Inc.
URS Corporation
183
178.5
167
 
This project has been deferred from this year's budget cycle to a date to be determined.
 Attachment2/13/2009
  
KDOT Office to Randall RoadPhase IIInterconnect / ITS Improvements
140
8
DELCAN Corporation
Jacobs Engineering Group, Inc.
AECOM USA, Inc.
183
182
176
Delcan Corporation
 Attachment2/6/2009
  
Over Tyler CreekPhase IIBridge Replacement
136
34
Hampton,Lenzini and Renwick, Inc. (HLR)
MACTEC
Transystems
186.5
179
173.5
 
HLR
 Attachment2/2/2009
  
County-WidePlanningPlanning and Transportation Demand Modeling
140
7
CH2MHill, Inc. & subconsultants
Civiltech Engineering, Inc.
HDR Engineering, Inc. & subconsultants
Metro Transportation Group, Inc., & subconsultants
387.5
305
360
323.5
CH2M Hill, Inc.
 Attachment1/28/2009
  
Fabyan Parkway/VanNortwick Ave IntersectionPhase IIIntersection Improvements
140
64
STV
Bloom
AECOM
194
192
182
STV
 Attachment1/23/2009
  
Randall Road to Dunham RoadPhase IIIConstruction Observation
144
41
Bollinger Lach and Assoc.
Christopher B. Burke Engineering, Ltd.
Burns and McDonnell
AECOM
Civiltech Engineering, Inc.
204
177
174
173
171
Contract 2 - Christopher B Burke Engineering Ltd, Contract 3 - Bollinger Lach and Assoc, Contract 5 - Civiltech Engineering, Inc.
 Attachment1/21/2009
  
Randall/Fabyan IntersectionPhase IIIntersection Improvements
140
63
Crawford, Murphy, Tilly
Burns & McDonnell
URS Corp
190
185
179.5
Crawford, Murphy, Tilly (CMT)
 Attachment12/3/2008
  
County-WidePhase I/IIStructural Design Services
140
48
Christian-Roge & Associates, Inc.
Ciorba Group, Inc.
Entran
V3
186
196
197
195
 
Ciorba Group, Inc.; Entran
 Attachment12/3/2008
  
County-WidePhase IStructural Design Services
140
41
Bollinger, Lach & Associates
Robert H. Anderson & Associates, Inc.
STV, Inc.
Teng & Associates, Inc.
201.5
209.5
197
212
 
Robert H. Anderson & Associates; Teng & Associates
 Attachment11/24/2008
  
IL 25 - This contract includes the new structure over the FoxPhase IIIConstruction Observation
144
31
Omega and Assoc.
Bollinger Lach and Assoc.
Clark Dietz Engineers
Teng
188.5
176
170
150.5
 
Omega and Associates
 Attachment11/24/2008
  
Randall Rd to Dunham RdPhase IIIConstruction Management
144
24
Benesch
Burns and McDonnell
Baker Engineering Inc.
Civiltech Engineering Inc.
175.5
159
157
134.5
Benesch
 Attachment11/21/2008
  
Randall Road to Rochester RoadPhase IITraffic Signal Interconnect and Modernization
140
26
Delcan
Pavia-Marting
Hanson
186
181
164
Delcan
 Attachment11/21/2008
  
Dean Street to Main StreetPhase IITraffic Signal Interconnect and Modernization
140
26
CBBEL
Jacobs
ESI
192.5
188
144
CBBEL
 Attachment11/21/2008
  
Huntley / Galligan RoadPhase IIntersection Improvements
140  and Project Advertized in Newspaper
47
Bloom Consultants
Pavia Marting & Co
Kuderna & Associates
217.5
177.5
169
Bloom Consultants
 Attachment11/5/2008
  
Randall Rd at South StPhase IBikepath connection across Randall
140 and Project Advertized in Newspaper
35
RHA&A
Kimley-Horn
HDR
206
203.5
194
RHA&A
 Attachment10/10/2008
  
IL 25-Gilbert St to Hickory LnPhase IIIConstruction Observation
144  and Project Advertized in Newspaper
8
Christopher B Burke Engineering LTD
Teng and Associates Inc
ESI Consultants LTD
194
175
164
Christopher B Burke Engineering LTD
 Attachment7/8/2008
  
IL 38 to Sullivan RoadPlanningOptimize transit operations, transit-oriented land use within corridor, and ridership and provide a cost-effective implementation plan
10
CTE Engineers, Inc (EDAW and Earthtech)
STV Engineering (MKC Associates, Topografis, and Images, Inc.)
T.Y. Lin International (Houseal-Lavigne Associates)
Wilbur Smith Associates (Camiros)
300
274
227
213
CTE Engineers, Inc (EDAW and Earthtech)
 Attachment5/29/2008
  
Illinois-Wisconsin State Line to US 30PlanningIL 47 Corridor Planning Study
20
Civiltech Engineering, Inc. and sub consultants (The Lakota Group,
       Inc. and Hampton, Lenzini and Renwick, Inc.)
HDR Engineering, Inc. and sub consultants  (Baxter Woodman, Inc.,
       Images Inc., and S.B. Friedman and Co.)
Land Vision, Inc., and sub consultants (Glatting Jackson Kercher
       Anglin, Inc., Christopher B. Burke Engineering West, Ltd.
       and Robert H. Anderson and Associates, Inc.)
Teska Associates, Inc. and sub consultants (Vlecides-Schroeder
       Associates, Inc., Metro Transportation Group, Inc., and
       Graef Anhalt Schloemer & Associates, Inc.)
T.Y. Lin International and sub consultants (Houseal Lavigne
       Associates, LLC and SEC Group, Inc. )
124
 
142
 
118
 
 
122
 
 
151
T.Y. Lin International and sub consultants (Houseal Lavigne Associates, LLC and SEC Group, Inc.)
 Attachment5/27/2008
  
Square Barn Road to Sleepy Hollow Road and Corporate Blvd to Huntley RoadPhase IITraffic Signal Interconnect and Modernization
140 and Project Advertized in Newspaper
29
H.W. Lochner, Inc.
CBBEL, Ltd.
Jacobs Engineering Group
199
192.5
182.5
H.W. Lochner, Inc.
 Attachment5/27/2008
  
Kirk at Douglas, Main at Nelson Lake, Mooseheart at IL 31Phase IIntersection Improvements
140 and Project Advertized in Newspaper
42
H.W. Lochner, Inc.
HLR, Inc.
Patrick Engineering, Inc.
Hanson Professional Services Inc.
208.5
206
205
191
H.W. Lochner, Inc., HLR, Inc.
 Attachment4/30/2008
  
Seavey Road Maintenance FacilityPhase IIStructure Design
0
7
Engineering Enterprises
Kueny Architects
Strand Associates
Graef Anhalt Schloemer
163
108
136
71
 
Engineering Enterprises
 Attachment4/25/2008
  
CountywideStudiesTraffic Data Collection (Traffic Counting)
140
7
Regina Webster & Associates, Inc.
TERRA Engineering, Ltd.
Gewalt Hamilton Associates, Inc.
198
191
188.5
Regina Webster & Associates, Inc.
 Attachment4/4/2008
  
CountywidePhase I/IIStructural Design Services
0
33
Bollinger, Loch & Associates
Entran
Smith Engineering
Strand & Associates
209
192.5
214
197.5
Bollinger, Loch & Associates, SEC Group, Strand & Associates
 Attachment3/31/2008
  
IL72 to Binnie Rd and Red Haw to Silver Glen RdPhase III Construction ObservationTraffic Signal Interconnect and Modernization
140 along with Project Advertized in Newspaper
15
Ciorba Group
Gewalt Hamilton and Assoc
DLZ Illinois, Inc.
173
165
156
Ciorba
 Attachment3/11/2008
  
County-WideEngineeringStearns Bridge Corridor, as needed
0
21
Andrews Engineering
Engineering Enterprises
Smith Engineering
183.5
171.5
183.5
 
Andrews Engineering
 Attachment2/14/2008
  
Intersection ImprovementsPhase IITraffic Signal Modernization & Intersection Improvement
140 along with Project Advertized in Newspaper
41
STV Engineering
Teng
Strand Associates
209
208
200
STV Engineering
 Attachment1/17/2008
  
County-WidePhase III - Material Testingvarious locations as needed
Number Unknown, Project Advertized in Newspaper
6
Midland Standard Engineering
State Testing Services
Great Lakes Soil & Environmental Testing
 
 
184
170
155
 
Midland Standard Engineering
 Attachment12/20/2007
  
Intersection ImprovementsPhase IIntersection Safety Enhancements
Number Unknown, Project Advertized in Newspaper
28
Bloom Companies, LLC.
Patrick Engineering, Inc.
Teng
209
209
187
Bloom Companies, LLC.
1 - 100Next