| | | 10/29/2012 | | Lake Run Creek | Engineering | Bridge Rehabilitation/Replacement | 140 | 33 | | | Wills, Burke Kelsey Associates |
| | | 10/29/2012 | | Fitchie Creek | Engineering | Bridge Replacement | 140 | 33 | | | Wills Burke Kelsey Associates |
| | | 10/26/2012 | | Il. Rt 25 to Hill Avenue | Phase I | Phase One Study | 134 | 42 | | | HDR |
| | | 10/24/2012 | | Various | Engineering | Structure Inspections | 140 | 15 | Hampton, Lenzini and Renwick, Inc.
Collins Engineers, Inc.
Michael Baker, Jr. Inc | | Collins Engineers, Inc. |
| | | 10/24/2012 | | LaFox Road at UPRR track and Brundige Road at UPRR Tracks | Engineering | Design, agency coordination, construction oversight | 140 | 6 | | | Hanson Professional Service, Inc. |
| | | 10/24/2012 | | Cherry Lane to Illinois Route 38 | Engineering | Structure Rehabilitation | 140 | 38 | Alfred Benesch & Company
Crawford, Murphy & Tilly, Inc.
Strand Associates
| Strand Associates -- 218.5
Alfred Benesch and Company -- 215.5
Crawford, Murphy & Tilly, Inc. -- 202.5
| Strand Associates |
| | | 9/4/2012 | | N/A (Countywide) | Traffic Engineering/Operations | Administration assistance for the management of the County’s traffic operations infrastructure. | 140 | 1 | Hampton, Lenzini & Renwick, Inc. (HLR) | | Hampton, Lenzini & Renwick, Inc. (HLR) |
| | | 8/31/2012 | | Various | Phase II | Preparation of all necessary engineering and PS&E documents for the deployment of various roadway safety countermeasures at various Kane County highway locations. | 140 | 21 | Christopher B. Burke Engineering, Ltd. (CBBEL)
Hanson Professional Services, Inc.
Terra Engineering, Ltd. | Christopher B. Burke Engineering, Ltd. (CBBEL) - 187.5
Hanson Professional Services, Inc. - 182.5
Terra Engineering, Ltd. - 182.5 | Christopher B. Burke Engineering, Ltd. (CBBEL) |
| | | 5/29/2012 | | at Nelson Lake Road | Phase II | Intersection Improvement | 140 | 34 | | Lochner......201.5
SE3........207.5
V3.........192 | SE3 |
| | | 3/24/2012 | | NA | Implementation | Year 2012 Geographic Information System Support Services | 140 | 8 | | GIS Solutions, Inc.................209 Great Arc Technologies Inc..206 TY Lin International..............176 | GIS Solutions, Inc. |
| | | 3/8/2012 | | Keslinger Road to IL Rte 38 in Elburn Illinois | Phase III | Reconstruction and new construction of Anderson Road with bridge at UPRR | 140 | 26 | STV
Bollinger, Lach and Assoc
HR Green | STV-193
Bollinger,Lach and Assoc-198
HR Green-202 | HR Green |
| | | 2/28/2012 | | Gary Ln, Delnor Dr and Randall Rd UPRR Bridge | Phase III | Construction of HMA bike path w/ 12 foot PCC tunnel & misc items | 140 | 27 | | | Civiltech |
| | | 2/27/2012 | | KDOT Campus | Phase III | Construction Observation services for the construction of an approximate 4,800 Sq Ft (including basement) building addition for an Arterial Operations Center, additional office and storage space. | 140 | 6 | ESI Consultants, Ltd.
Knight E/A, Inc.
Larson & Darby Group | Knight E/A, Inc. - 173
Larson & Darby - 164
ESI Consultants, Ltd. - 149 | Knight E/A, Inc. |
| | | 2/27/2012 | | NA | Software/System Engineering | Development and integration of Advanced Traffic Management System (ATMS) software and integration to the existing Kane County ATMS/ITS communications network and future Arterial Operations Center (AOC). | 140 | 2 | Delcan Corporation
TransCore ITS, LLC | TransCore ITS, LLC - 181.0
Delcan Corporation - 160.5 | TransCore ITS, LLC |
| | | 2/16/2012 | | Various | Phase II | Bridge Rehabilitation | 140 | 38 | WBK
exp
Baxter & Woodman
Fehr-Graham | WBK......188
exp.........176.5
Baxter & Woodman......174.5
Fehr Graham.......178 | WBK, Fehr Graham, exp |
| | | 2/3/2012 | | Countywide | Phase III | Material Testing and project support as directed | 140 | 9 | AECOM,
Rubino Engineering Inc,
STATE Testing | AECOM---------166
Rubino Engineering--213
STATE Testing-------209 | Rubino Engineering Inc |
| | | 1/3/2012 | | on Allen Road between Walker and Harmony Roads | Phase III | Stabilization of existing stream banks for Hampshire Creek | 140 | 12 | Christopher B. Burke Engineering LTD,
Cotter Consulting Inc,
ERA | CBBEL--------168
Cotter----------------161
ERA-------------------145
| Christopher B. Burke Engineering LTD (CBBEL) |
| | | 12/2/2011 | | Varioius locations | Phase II | Preparation of all necessary engineering and PS&E documents for the deployment of various roadway safety countermeasures at various Kane County highway locations. | 140 | 12 | ESI Consultants, Ltd.
Regina Webster & Associates, Inc.
HDR | ESI Consultants, Ltd. - 179.0
Regina Webster & Associates, Inc. - 171.0
HDR - 164.5 | ESI Consultant, Ltd. |
| | | 12/2/2011 | | Stearns Road - Randall Road to the Kane/DuPage County line | Phase II | Preparation of all necessary engineering and PS&E documents for the deployment of various ITS technologies. | 140 | 6 | Gewalt Hamilton & Associates, Inc.
JACOBS Engineering Group, Inc.
HDR | JACOBS Engineering Group, Inc. - 184.0
Gewalt Hamilton & Associates, Inc. - 172.5
HDR - 170.5 | JACOBS Engineering Group, Inc. |
| | | 11/30/2011 | | at Kaneville Rd | Phase I/II | Intersection Improvement | 140 | 36 | | BLA - 194
Burns & McDonnell - 211.5
HDR - 209.5 | Burns & McDonnell |
| | | 11/22/2011 | | Closest roads are Bahr and Berner and Berner and IL US 20 | Phase III | Pavement Widening & Resurfacing, left and right turns lanes,etc | 140 | 25 | | BLA-------203
Clark Dietz------197
HR Green--------185 | Bollinger Lach and Assoc(BLA) |
| | | 11/21/2011 | | Kane County | Survey Services | Survey assistance as needed. | 140 | 30 | Trotter & Associates
Hampton, Lenzini, Renwick | | Trotter and Associates |
| | | 10/21/2011 | | Intersection | Phase I | Intersection Improvement | 140 | 47 | | | Thomas Engineering |
| | | 9/13/2011 | | Butterfield Road to Stearns Road | Phase III | Modernization of 21 intersections for integration with ATMS facilities | 140 | 18 | Ciorba
Thomas Engineering Group
STV | Ciorba Group Inc----179
STV-------------------145 | Ciorba Group Inc. |
| | | 9/13/2011 | | Randall and Foothill Roads | Phase III | Intersection widening, lane add, storage increase and resurfacing | 140 | 29 | Homer Chastain and Assoc, LLP | Homer Chastain and Assoc, LLP- 190
Clark Dietz--------------------------187
TERRA Engr LTD--------------------171 | Homer Chastain and Assoc, LLP |
| | | 9/6/2011 | | N/A | Studies | Performance of various traffic engineering studies and tasks on an "as needed" basis. | 140 | 16 | TY Lin International
Hanson Professional Services, Inc.
Traffic Analysis & Design, Inc. | Hanson Professional Services, Inc. - 179.5
Traffic Analysis & Design, Inc. - 178.5
TY Lin International - 174.0
| Hanson Professional Services, Inc. |
| | | 8/29/2011 | | Blackberry Creek | Phase II | Structure Replacement | 140 | 39 | Henry O. Hefter-Associates, Inc.
Wills Burke Kelsey Associates, Ltd.
Teng & Associates, Inc. | Wills Burke Kelsey Associates, Ltd. - 218
Teng & Associates - 206.5
Henry O. Hefter-Associates, Inc - 189.5 | Wills Burke Kelsey Associates, Ltd. |
| | | 7/5/2011 | | at IL 47 | Phase II | Intersection improvement | 140 | 44 | | Burns & McDonnell - 211.5
Strand - 210.5
CMT - 209.5 | Burns & McDonnell |
| | | 6/24/2011 | | Intersection | Phase I | Intersection Safety Improvements | 140 | 45 | | | Patrick Engineering |
| | | 6/13/2011 | | At intersection of McLean Blvd and Stearns Road | Phase III | Clearing and grading to create a new walking trail and nature area | 140 | 16 | AECOM
MACTEC
Thomas Engineering Group | AECOM- 161
EMAC fka MACTEC-174
Thomas Engineering Group- 118 | EMAC fka MACTEC |
| | | 4/25/2011 | | Hampshire Creek | Phase I/Phase II | Bridge Replacement | 140 | 44 | Wills Burke Kelsey Associates, Inc.
Reynolds, Smith and Hills, Inc.
Teng & Associates, Inc. | Wills Burke Kelsey Associates, Inc. - 212
Teng & Associates, Inc. - 206
Reynolds, Smith and Hills, Inc. - 203 | Wills Burke Kelsey Associates, Inc. |
| | | 4/25/2011 | | As noted | Phase I/Phase II | See attached | 140 | 42 | WBK
Lonco
Baxter and Woodman
STV | WBK – 213.5 points
Baxter and Woodman – 198.5 points | WBK and Baxter &Woodman |
| | | 4/25/2011 | | I88 | Phase II | See attachment | 140 | 31 | Strand Associates, Inc.
STV, Inc.
Baxter and Woodman, Inc. | STV - 201.5
Strand Associates, Inc. - 198
Baxter and Woodman, Inc. - 188 | STV |
| | | 4/21/2011 | | Development, Implementation and Technical Assistance | Impact Fee Ordinance Update | Impact Fee Ordinance Update | 136 | 6 | CH2M Hill...............211
Wilbur Smith..........187.5 | | CH2M Hill |
| | | 3/14/2011 | | Intersection | Phase II | Intersection Safety Improvements | 138 | 53 | Bloom,
Pavia Marting
Gewalt Hamilton
| | Gewalt Hamilton |
| | | 3/14/2011 | | Intersection | Phase II | Intersection Improvements | 138 | 55 | | | CMT |
| | | 3/1/2011 | | N/A (Countywide) | Traffic Engineering | Administration assistance for the management of the County’s traffic operations infrastructure, including approx. 140 traffic signal/flashing beacon locations, 900 street lights & approx. 45 mile of fiber optic ATMS network | 136 | 3 | 1) Delcan Corporation
2) Hampton, Lenzini & Renwick, Inc.
3) Sam Schwartz Engineering, PLLC | 1) Hampton, Lenzini & Renwick, Inc. (HLR) - 200.0
2) Delcan Corporation - 186.5
3) Sam Schwartz Engineering, PLLC - 162.5
| Hampton, Lenzini & Renwick, Inc. (HLR) |
| | | 3/1/2011 | | Countywide | Traffic Engineering | The collection of various traffic data, including vehicle volume, speed, classification, etc. for various county highways for the years 2011 & 2012 and preparation of required deliverables. | 136 | 6 | 1) Gewalt Hamilton & Associate, Inc.
2) Regina Webster & Associates, Inc.
3) Terra Engineering LTD. | 1) Gewalt Hamilton & Associate, Inc. - 192.0 2) Terra Engineering LTD. - 191.5 3) Regina Webster & Associates, Inc. - 186.5 | Gewalt Hamilton & Associate, Inc. |
| | | 2/10/2011 | | Umdenstock Road from Stearns Road to 597' north of Stearns Road | Phase III | Removal of existing bridge structure and approaches. Construct a new bridge and approaches in a new location. | 136 | 35 | Crawford, Murphy & Tilly, Inc.
Environmental Design International, Inc.
Omega | Crawford, Murphy & Tilly, Inc___________180
Environmental Design International, Inc__173
Omega_____________________________186 | Omega |
| | | 1/14/2011 | | US 30 to Jericho Road | Phase III | Widen and reconstruction with storm water and traffic signal improvements | 136 | 38 | Bollinger Lach and Assoc, Inc
Civiltech Engineering, Inc.
Ciorba Group | Bollinger Lach------------------------139.5
Civiltech Engineering, Inc----------140.0
Ciorba Group------------------------127.5 | Civiltech Engineering, Inc |
| | | 12/23/2010 | | Stevens Road to Burr Road | Phase III | Remove concrete slab bridge and construct precast three sided structure. | 136 | 27 | | BLA___197
ESI___185
STV___169 | BLA |
| | | 12/8/2010 | | Randall Rd at Fabyan Parkway | Phase III | Roadway reconstruction, widen and add lane with storm sewer and traffic signal moderization | 136 | 39 | Ciorba Group
Entran
TranSystems | Ciorba Group-----------------------------152.0
Entan--------------------------------------149.5
TranSystems-----------------------------167.0 | TranSystems |
| | | 12/7/2010 | | Randall Rd at I-88 overpass | Phase III | Remove and replace deck, abutments, approach slab and other features per plan | 136 | 36 | V3
Cotter Consulting
Homer Chastain and Assoc, LLP | V3-------------------------------------182.0
Cotter Consulting--------------------169.0
Homer Chastain and Assoc, LLP--- 176.0 | V3 |
| | | 12/1/2010 | | Damisch Road to McCormick Road | Phase III | Remove two structures, build one, and relocate creek | 136 | 37 | 2IM Group
Cotter Consulting, Inc.
TranSystems | 2IM Group____________175
Cotter Consulting, Inc___204
TranSystems__________167 | Cotter Consulting, Inc. |
| | | 11/10/2010 | | Sullivan Road northerly to Illinois Route 38, and along Illinois Route 38 westerly to the Kane County Judicial Center | Phase II | Develop Phase 2 plans for Bus access along Randall road | 135 | 28 | | | V3 Companies |
| | | 10/14/2010 | | County wide | Phase III | Remove and replace wearing surface and other features to 6 bridges | 136 | 32 | Thomas Engineering Group, TranSystem, Stanley Consultants Inc | Thomas---------------------------178
Transystem-----------------------154
Stanley Consultants Inc----------171 | Thomas Engineering Group |
| | | 8/24/2010 | | at Douglas Road | Phase II | Intersection Improvement | 136 | 52 | H. W. Lochner James J. Benes and Associates Knight Engineers & Architects | Lochner 208.5 JJB 208 Knight 200 | Lochner |
| | | 8/5/2010 | | Dunham Rd to Randall Rd | Phase III | Construction observation of planting, seeding and various site improvements | 136 | 17 | Omega and Assoc
Engineering Services Group Inc
Hey and Assoc Inc | Hey and Assoc-------------163
Omega----------------------160
Engr Serv Group Inc--------90 | Hey and Associates |
| | | 7/27/2010 | | Square Barn to Sleepy Hollow and Binnie to Countyline Rd | Phase III | Expansion of County Traffic Signal Innerconnection System | 136 | 25 | MACTEC,
DLZ Illinois,
Gewalt Hamilton | MACTEC---------------------------------------------155
Gewalt-----------------------------------------------147
DLZ--------------------------------------------------131
| MACTEC |
| | | 6/24/2010 | | Lake Marian River | Phase II | Culvert Rehabilitation/Replacement | 136 | 38 | | | Hampton, Lenzini and Renwick |
| | | 6/23/2010 | | Various | Phase II | Final Design and Permitting | 136 | 38 | Homer Chastain, SEC, Strand Associates | Homer Chastain - 207.5
SEC - 203.5
Strand - 203 | Homer Chastain |
| | | 5/27/2010 | | Building "A" | Studies | Investigate moisture collection and water leakage issues and to provide an effective solution. | 140 and also advertised in the Chicago Tribune paper. | 11 | | Epstein 154.5
Kluber, Inc. 141
PSI, Inc. 107.5 | Epstein |
| | | 5/3/2010 | | Not Applicable | Software Design | General technical support to GIS staff and enhancement and data integration of internal data viewer based on ESRI's flex api and GIS Server. | 140 | 8 | GIS Solutions Inc. -
Great Arc Technologies, Inc. -
Patrick Engineering, Inc. - | | GIS Solutions Inc. |
| | | 4/30/2010 | | Intersection | Phase II | Intersection and Realignment Plank at Burlington | 140 | 65 | Crawford, Murphy, Tilly, Inc.
H.W. Lochner, Inc.
Thomas Engineering Group, LLC | | Crawford, Murphy, Tilly, Inc. |
| | | 2/11/2010 | | various | Phase II | Bridge Maintenance | 140 | 37 | V3 Companies
Crawford, Murphy, Tilly, Inc.
Engineering Resource Associates, Inc. | | V3 Companies |
| | | 2/8/2010 | | none | Phase III | On Call Material Testing for various County Construction Projects | 140 | 7 | Midland Standard Engineering and Testing, Inc STATE Testing, LLC Tecma Testing, Inc | Midland Standard Engineering and Testing..164
STATE Testing..........................................160
Tecma Testing..........................................141 | Midland Standard Engineering and Testing, Inc |
| | | 1/5/2010 | | 1/4 mile west of Big Timber and 2.5 miles north of Highland Ave | Phase III | See SOI for project scope and description | 140 | 38 | ESI Consultants, Ltd Burns and McDonnell Trotter and Assoc, Inc.
| | ESI Consultants, Ltd |
| | | 12/22/2009 | | Various | Engineering | Structure Inspections | 128 | 34 | SEC Group
Crawford Murphy Tilly
Hampton Lenzini Renwick | | Hampton Lenzini Renwick |
| | | 11/17/2009 | | Stearns Rd to IL 56/Butterfield Rd | Phase II | Interconnect & ITS Modernization | 144 | 20 | Jacobs Gewalt Hamilton AECOM
| | Jacobs |
| | | 11/17/2009 | | IL 25 to Nagle Blvd | Phase I/II | Adding continuous left turn lane | 144 | 48 | | | EEI |
| | | 11/3/2009 | | County-wide | Implementation | Survey Assistance as needed | 140 | 35 | Hampton, Lenzini, and Renwick, Inc.
Engineering Enterprises, Inc.
Trotter and Associates, Inc.
| | Hampton, Lenzini, and Renwick, Inc. |
| | | 10/21/2009 | | County-Wide | Engineering | Professional services from a qualified firm to provide for automated data collection, analysis, and software system for Pavement Management | 144 | 10 | Applied Research Associates (ARA)
Infrastructure Management Services (IMS)
Transmap | | Applied Research Associates (ARA) |
| | | 10/8/2009 | | at Foothill/US 20 Ramps | Phase II | Intersection Improvements | 140 | 48 | HDR Kudrna Mactec | | HDR |
| | | 9/3/2009 | | n/a | On-Appraisal Services | On-Call Appraisals | 140 | 13 | | | Civiltech & Hopkins |
| | | 9/3/2009 | | n/a | Review Appraisal Services | On-Call Review Appraisal Services | 140 | 10 | | | Polach & Tibble |
| | | 8/13/2009 | | N/A | On-Call Traffic Engineering | On-call engineering for various traffic related engineering tasks. | 140 | 18 | TY Lin International, Inc.
Hanson Professional Services, Inc.
CEMCON, LTD
Gewalt Hamilton Associates, Inc. | | TY Lin International, Inc. |
| | | 6/16/2009 | | 0.9 miles west of IL Rte 47 and 1000 ft east | Phase III | See attached description on SOI | 140 | 28 | Collins Engineers, Inc.
ESI Consultants,LTD
Knight Engineers and Architects | | Collins Engineers, Inc. |
| | | 5/12/2009 | | Countywide | Traffic Signal Engineering | Providing assistance to our Traffic Engineering staff with the management and operations the County’s Traffic Signal/ITS/Street Lighting Systems. | 140 | 4 | Hampton, Lenzini & Renwick, Inc. (HLR)
Delcan Corporation
Christopher B. Burke Engineering, Ltd. (CBBEL)
Gewalt Hamilton Associates, Inc. (GHA) | | Hampton, Lenzini & Renwick, Inc. (HLR) |
| | | 4/16/2009 | | County-Wide | Planning | Transit Component of the Kane County Long Range Comprehensive Plan | 140 | 4 | AECOM
Nelson/Nygaard
Vlecides/Schroeder Consulting Associates, Inc | | Nelson/Nygaard |
| | | 3/25/2009 | | Between Randall Rd and Corron Rd | Phase III | Construction Observation | 140 | 32 | SEC Group, Inc. Thomas Engineering Group
Infrastructure Engineering, Inc. ESI consultants, Ltd. | | SEC Group, Inc. |
| | | 2/24/2009 | | Orchard Rd to Main St | Phase III | Construction Observation | 140 | 8 | Hampton, Lenzini and Renwich, Inc.
GRAEF-USA Ciorba Group, Inc | | Hampton, Lenzini and Renwich, Inc. |
| | | 2/24/2009 | | Bliss and Merrill Roads | Phase III | Construction Observation | 140 | 33 | GRAEF_USA DLZ
RM Chin and Assoc, Inc | | Graef |
| | | 2/13/2009 | | Randall Rd & Huntley Rd Intersection | Phase II | Intersection Improvements | 140 | 50 | V3 Companies, Ltd.
Baxter & Woodman, Inc.
URS Corporation | | This project has been deferred from this year's budget cycle to a date to be determined. |
| | | 2/13/2009 | | KDOT Office to Randall Road | Phase II | Interconnect / ITS Improvements | 140 | 8 | DELCAN Corporation Jacobs Engineering Group, Inc.
AECOM USA, Inc. | | Delcan Corporation |
| | | 2/6/2009 | | Over Tyler Creek | Phase II | Bridge Replacement | 136 | 34 | Hampton,Lenzini and Renwick, Inc. (HLR) MACTEC Transystems | | HLR |
| | | 2/2/2009 | | County-Wide | Planning | Planning and Transportation Demand Modeling | 140 | 7 | CH2MHill, Inc. & subconsultants Civiltech Engineering, Inc. HDR Engineering, Inc. & subconsultants Metro Transportation Group, Inc., & subconsultants | | CH2M Hill, Inc. |
| | | 1/28/2009 | | Fabyan Parkway/VanNortwick Ave Intersection | Phase II | Intersection Improvements | 140 | 64 | STV
Bloom
AECOM | 194
192
182 | STV |
| | | 1/23/2009 | | Randall Road to Dunham Road | Phase III | Construction Observation | 144 | 41 | Bollinger Lach and Assoc. Christopher B. Burke Engineering, Ltd.
Burns and McDonnell AECOM Civiltech Engineering, Inc.
| | Contract 2 - Christopher B Burke Engineering Ltd, Contract 3 - Bollinger Lach and Assoc, Contract 5 - Civiltech Engineering, Inc. |
| | | 1/21/2009 | | Randall/Fabyan Intersection | Phase II | Intersection Improvements | 140 | 63 | Crawford, Murphy, Tilly Burns & McDonnell URS Corp | 190
185
179.5
| Crawford, Murphy, Tilly (CMT) |
| | | 12/3/2008 | | County-Wide | Phase I/II | Structural Design Services | 140 | 48 | Christian-Roge & Associates, Inc. Ciorba Group, Inc. Entran V3 | | Ciorba Group, Inc.; Entran |
| | | 12/3/2008 | | County-Wide | Phase I | Structural Design Services | 140 | 41 | Bollinger, Lach & Associates Robert H. Anderson & Associates, Inc. STV, Inc. Teng & Associates, Inc. | | Robert H. Anderson & Associates; Teng & Associates |
| | | 11/24/2008 | | IL 25 - This contract includes the new structure over the Fox | Phase III | Construction Observation | 144 | 31 | Omega and Assoc.
Bollinger Lach and Assoc. Clark Dietz Engineers Teng | | Omega and Associates |
| | | 11/24/2008 | | Randall Rd to Dunham Rd | Phase III | Construction Management | 144 | 24 | Benesch
Burns and McDonnell
Baker Engineering Inc. Civiltech Engineering Inc. | | Benesch |
| | | 11/21/2008 | | Randall Road to Rochester Road | Phase II | Traffic Signal Interconnect and Modernization | 140 | 26 | Delcan Pavia-Marting Hanson
| | Delcan |
| | | 11/21/2008 | | Dean Street to Main Street | Phase II | Traffic Signal Interconnect and Modernization | 140 | 26 | | | CBBEL |
| | | 11/21/2008 | | Huntley / Galligan Road | Phase I | Intersection Improvements | 140 and Project Advertized in Newspaper | 47 | Bloom Consultants Pavia Marting & Co Kuderna & Associates
| 217.5
177.5
169
| Bloom Consultants |
| | | 11/5/2008 | | Randall Rd at South St | Phase I | Bikepath connection across Randall | 140 and Project Advertized in Newspaper | 35 | | | RHA&A |
| | | 10/10/2008 | | IL 25-Gilbert St to Hickory Ln | Phase III | Construction Observation | 144 and Project Advertized in Newspaper | 8 | Christopher B Burke Engineering LTD
Teng and Associates Inc
ESI Consultants LTD | | Christopher B Burke Engineering LTD |
| | | 7/8/2008 | | IL 38 to Sullivan Road | Planning | Optimize transit operations, transit-oriented land use within corridor, and ridership and provide a cost-effective implementation plan | | 10 | CTE Engineers, Inc (EDAW and Earthtech)
STV Engineering (MKC Associates, Topografis, and Images, Inc.)
T.Y. Lin International (Houseal-Lavigne Associates)
Wilbur Smith Associates (Camiros) | | CTE Engineers, Inc (EDAW and Earthtech) |
| | | 5/29/2008 | | Illinois-Wisconsin State Line to US 30 | Planning | IL 47 Corridor Planning Study | | 20 | Civiltech Engineering, Inc. and sub consultants (The Lakota Group,
Inc. and Hampton, Lenzini and Renwick, Inc.)
HDR Engineering, Inc. and sub consultants (Baxter Woodman, Inc.,
Images Inc., and S.B. Friedman and Co.)
Land Vision, Inc., and sub consultants (Glatting Jackson Kercher
Anglin, Inc., Christopher B. Burke Engineering West, Ltd.
and Robert H. Anderson and Associates, Inc.)
Teska Associates, Inc. and sub consultants (Vlecides-Schroeder
Associates, Inc., Metro Transportation Group, Inc., and
Graef Anhalt Schloemer & Associates, Inc.)
T.Y. Lin International and sub consultants (Houseal Lavigne
Associates, LLC and SEC Group, Inc. ) | | T.Y. Lin International and sub consultants (Houseal Lavigne Associates, LLC and SEC Group, Inc.) |
| | | 5/27/2008 | | Square Barn Road to Sleepy Hollow Road and Corporate Blvd to Huntley Road | Phase II | Traffic Signal Interconnect and Modernization | 140 and Project Advertized in Newspaper | 29 | H.W. Lochner, Inc.
CBBEL, Ltd.
Jacobs Engineering Group | | H.W. Lochner, Inc. |
| | | 5/27/2008 | | Kirk at Douglas, Main at Nelson Lake, Mooseheart at IL 31 | Phase I | Intersection Improvements | 140 and Project Advertized in Newspaper | 42 | H.W. Lochner, Inc.
HLR, Inc.
Patrick Engineering, Inc.
Hanson Professional Services Inc. | | H.W. Lochner, Inc., HLR, Inc. |
| | | 4/30/2008 | | Seavey Road Maintenance Facility | Phase II | Structure Design | 0 | 7 | Engineering Enterprises
Kueny Architects
Strand Associates
Graef Anhalt Schloemer | | Engineering Enterprises |
| | | 4/25/2008 | | Countywide | Studies | Traffic Data Collection (Traffic Counting) | 140 | 7 | Regina Webster & Associates, Inc.
TERRA Engineering, Ltd.
Gewalt Hamilton Associates, Inc. | | Regina Webster & Associates, Inc. |
| | | 4/4/2008 | | Countywide | Phase I/II | Structural Design Services | 0 | 33 | Bollinger, Loch & Associates
Entran
Smith Engineering
Strand & Associates | | Bollinger, Loch & Associates, SEC Group, Strand & Associates |
| | | 3/31/2008 | | IL72 to Binnie Rd and Red Haw to Silver Glen Rd | Phase III Construction Observation | Traffic Signal Interconnect and Modernization | 140 along with Project Advertized in Newspaper | 15 | Ciorba Group
Gewalt Hamilton and Assoc
DLZ Illinois, Inc. | | Ciorba |
| | | 3/11/2008 | | County-Wide | Engineering | Stearns Bridge Corridor, as needed | 0 | 21 | Andrews Engineering
Engineering Enterprises
Smith Engineering | | Andrews Engineering |
| | | 2/14/2008 | | Intersection Improvements | Phase II | Traffic Signal Modernization & Intersection Improvement | 140 along with Project Advertized in Newspaper | 41 | STV Engineering
Teng
Strand Associates
| | STV Engineering |
| | | 1/17/2008 | | County-Wide | Phase III - Material Testing | various locations as needed | Number Unknown, Project Advertized in Newspaper | 6 | Midland Standard Engineering
State Testing Services
Great Lakes Soil & Environmental Testing
| | Midland Standard Engineering |
| | | 12/20/2007 | | Intersection Improvements | Phase I | Intersection Safety Enhancements | Number Unknown, Project Advertized in Newspaper | 28 | Bloom Companies, LLC.
Patrick Engineering, Inc.
Teng
| | Bloom Companies, LLC. |